Tour & Taxis housing (S3), Brussels,
Belgium, 2016-2023

The ‘Central’ is the second of seven blocks by Sergison Bates architects forming part of the Tour and Taxis Residential quarter. This building stands at the centre of the 'Dreef' - a row of solitaires at the heart of the broader masterplan. It contains 44 apartments and commercial premises on its ground floor.

The building has the character of a robust warehouse, with monumental brick piers and precast concrete beams. Its cubic form is emphasised by open loggias at each corner. The precast concrete beams have a concave shape and a pronounced ‘head’ that rests on the brick piers. In communal circulation spaces, the exposed brickwork and concrete structure create an atmosphere that is more industrial than it is domestic.

On the upper floors two offset linked halls provide access to the apartments, which are internally organised as free-flowing spaces, with the kitchen adjacent to the covered loggia and living spaces radiating from it.

See more on the masterplan here

Competition: 2015
Project duration: 2016 - 2023
Gross internal area: 3,690m2

Project team: Tom Appels, Juan Barcia Mas, Stephen Bates, José Bergua, Jasper Caenepeel, Darius Chambrin, Sven Gillet, Sandro Hernandez Rosales, Andrew Jackson, Zhovana Khalwatyan (project architect phase 2), Cornelis Knuth, Sarah Köstler, Dionisio Mora, Andra Pop-Jurj, Koen Schaballie (project architect phase 1), Angel Solanellas, Mark Tuff, Marije Van Diemen, Camiel Van Noten, Gilles Willem

Masterplan in collaboration with AWG↗ , noAarchitecten↗ and Bas Smets↗

Photographs: Stijn Bollaert

Ground floor plan
Typical floor plan
1 / 2Ground floor plan