Wandsworth workshops & factory redevelopment, London,
UK, 1999-2004

The project involved the partial demolition, refurbishment, extension and densification of an existing 1930s building, originally a paint factory sited alongside the river Wandle.

A timber-framed, single storey extension was added on top of the existing building. Supported on a steel transfer structure, the new storey provides eleven apartments, accessed by a new lift. Entry to the apartments is via a timber decked covered walkway which extends from one end to the other, with small open-air courtyards connect to it providing access to each apartment. Within the apartments, rooms are arranged around a central hall, which opens fully onto the open-air courtyards. Living rooms and bedrooms open out onto a covered balcony.

A new six-storey apartment building was added at the southern end, on the site of a former car park, extending the undulating form of the buildings adjacent to it. Four apartments are located on each upper floor with live/work units on the ground floor.

Project duration: 1999 - 2004
Gross internal area: 4,200 m2
Contract value: £4.5 million

Project team: Stephen Bates, Johanna Backas, Nikolaj Bechtel, Andrew Davy, Guy Derwent, Aidan Hodgkinson, Tim Rettler, Juliette Scalbert, Jonathan Sergison, Joanna Sutherland, Mark Tuff (project architect), Jessica Zarges

Housing Design Award 2004

Photographs: Hélène Binet, Johan Dehlin